- KJ Program Process Simultaneous Engineering & Final Design (Trim, Chassis, Tire & Final Ass’y) at the new Jeep Liberty Toledo Assembly Plant, DaimlerChrysler
- NS Program Process Simultaneous Engineering & Final Design (Trim, Chassis, Tire & Final Assembly), DaimlerChrysler
- “2001 RS” Program: Simultaneous Engineering & Final Design (Body Shop), DaimlerChrysler
- NS Gas Tank Delivery System, DaimlerChrysler
- BR Program Process Simultaneous Engineering & Final Design (Engine, Door & Final Line Flattop), DaimlerChrysler
- “2002 DR” Program: Simultaneous Engineering & Final Design (Trim Shop), DaimlerChrysler
- Pilot/Simulation Facility at St. Louis Assembly Plant, DaimlerChrysler
- Chrysler Conner Ave. Viper Program
- Chrysler Belvidere 4500 T Transfer Press Installation layout & specifications
- Pilot/Simulation Facility at Warren Truck Assembly Plant, DaimlerChrysler
- Body Shop Carriers and Service & Work Platforms at Jefferson Ave., DaimlerChrysler
- DCX – Newark Assembly Plant Engineering Services for DCX 2004 “HB” Program, DaimlerChrysler
- DCX – Warren Truck Engineering Services for DCX 2005 “ND” Program, DaimlerChrysler
- Feasibility Study - Seat Storage, Sorting and Marshalling Facility, GM
- GM Doraville 3 Rail power & free chassis conv. Rearrangement
- Oldsmobile Lansing Pilot Plant special turntables and lifts for body carrier handling, GM
- GM Lake Orion O/H office mezzanines, brake test tunnel enclosure, and misc. paint shop.
- GMT-800 Janesville Trim & Body Shop Storage Study, GM
- GMT-800 Janesville Trim and Body Shop Demolition Procurement Package, GM
- Feasibility study, appropriation and facility layout of a Stamping Plant, GM
|
- Ford Oakville Cleaning, Phosphate & E-Coat Conveying System
- Ford Avon lake Instrument Panel Conveying System
- Ford Wixom 1998 Trim, Chassis and Final Assembly conveyors
- Study for Process and Facility Layout for Low Volume Production for Emerging Markets, Ford
- Trim, Chassis & Final Process and Facility layout for a Greenfield Plant in Madras, India including assembly line balancing, Ford
- Ford Oakville V-229 Project including Material Handling Systems
- Preliminary and final engineering for new Engine Foundry for Caterpillar Tractor Co.
- Ford, Michigan Casting Center: Studies and Final Engineering to improve productivity and capacity in all production areas including a 100,000 sf addition to building.
- John Deere, Illinois: Layout and design of new “prepared and Return” Sand System
- International Harvester: Development studies, preliminary and final engineering to establish renovation, modernization and expansion of existing foundry
- Frito Lay: Designed and engineered 23,000 sf warehouse expansion including an AS/RS system. Both conventional and automated material handling concepts were used
- US Postal Service: Design of material handling equipment for truck unloading, package delivery, surge storage systems, package and bag sorting, redistribution and truck loading systems
- DWSD Warehouse: Facilities design services for a new 155,000 sq.f. Warehouse. Project included validation of program storage requirements, layout and creation of contract documents
- Industrial Scrap Handling system, environmental procedures and improvements to coolant recovery system
- Proposed changes to Industrial Scrap Handling system to reduce cost and improve efficiency in handling – Machine shop turnings, cast iron borings, and steel solids
- Developed process layout for a new check processing facility, including automated checks Handling Systems
|